Analysis is done in three phases
- Input
- Analysis
- Output
Input:
- Line Designation Table (LDT) and P&ID from the Process Team
- Stress Isometric Drawing of Line to be analysed
- Process Flow Diagram/datasheet
- Equipment General Arrangement Drawing and detail drawings
- Piping Material Specification
- PSV/Control Valve General Arrangement and Datasheet from Instrumentation Team
- Soil Characteristics for underground analysis from civil team
- Nozzle load limiting Standards
- Plot plan to know the High point (finished) Pavement and equipment orientation
- Governing Code
Analysis:
- Checking the completeness of the piping system received as a stress package
- Node Numbering on Stress Iso
- Filling the design parameters on stress iso like
- Design Pressure
- Design Temperature
- Operating Pressure
- Min. Temperature
- Fluid Density
- Material
- Line Size
- Thickness
- Insulation Thk and Density
- Corrosion Allowance
- Modelling the piping system in caesar II using parameters from stress iso.
- Analyzing the system and obtaining the results
Output:
- Final Marked up iso’s for the Layout team
- Support Loads to Civil
- Spring Hanger Datasheets
- Datasheets for Special supports like swat brace, struts, snubbers etc.
- SPS drawings
- Stress Package Final Documentation for records